Weil-McLain 381700256 Base Panels
0 Available At All US Supply Locations

Weil-McLain EGH 115 S5 Base Panels – Reliable Heating Performance
The Weil-McLain EGH 115 S5 Base Panels are engineered for use with Weil-McLain EGH Series 5 steam boilers, providing long-lasting performance and consistent system reliability. Built from heavy-duty cast iron, these base sections deliver excellent heat retention and durability, ensuring stable operation across demanding residential and light commercial applications.
As part of the EGH Series 5, these panels are designed to integrate seamlessly with other Weil-McLain components, meeting the high standards expected by professional contractors. With proper installation and maintenance, they contribute to efficient system performance and extended equipment life.
Advantages of the EGH 115 S5 Base Panels
- Cast Iron Construction – Provides exceptional durability and thermal retention for steady heating output.
- High Capacity – Suitable for systems requiring up to 115,000 BTU/hr output.
- Proven Design – Engineered for compatibility with Weil-McLain EGH Series 5 boilers, ensuring reliable integration.
- Service Longevity – Built to withstand years of continuous use under real-world conditions.
Technical Specifications
- Model: EGH 115 S5
- Fuel Type: Natural gas or propane (when paired with appropriate burners)
- Heating Capacity: 115,000 BTU/hr (input)
- Material: Cast iron sections
- Efficiency: Up to 80–85% AFUE depending on system configuration
- System Type: Steam boiler applications
Installation Notes
Installation of the EGH 115 S5 Base Panels should only be performed by qualified HVAC or plumbing contractors. These cast iron components are heavy and require proper rigging and alignment during assembly. Correct sealing between sections and adherence to Weil-McLain’s installation manual is critical for safe and efficient operation.
- Tools Required: Section assembly tools, sealing rope, boiler sealant, torque wrenches, and lifting equipment.
- Considerations: Proper leveling of the base is required to prevent operational issues.
- Professional Installation Recommended: Compliance with ASME and local mechanical codes is mandatory.
What Contractors Should Know
For Contractors: The EGH 115 S5 base panels provide a durable foundation for steam boiler assemblies, ensuring reliable heat transfer and long-term service life. Their cast iron design supports efficient operation under varying load conditions.
For Facilities and Property Owners: While robust in construction, these panels must be installed correctly to ensure system safety and efficiency. Always engage a licensed professional for assembly and commissioning.
Summary
The Weil-McLain EGH 115 S5 Base Panels are built for strength, efficiency, and compatibility with Weil-McLain’s proven boiler systems. Their cast iron construction and reliable performance make them a trusted choice for contractors delivering long-term heating solutions in residential and light commercial environments.
Specifications
| Weight | 8.880000 |
|---|---|
| Length (inches) | 24 |
| Width (inches) | 30 |
| Height (inches) | 6 |
| Item Type | Boiler Parts |
| Brand | Weil McLain |
| Manufacturer | Weil McLain |
| MPN | 381700256 |
| Sub Type | Base Panels |
| Item Returns | This item can be returned |
